A precast element in Stomra is an ordinary wall with three things added: edge details, cast-in items and its reinforcement. Your assistant lays the elements out; you open one and review it.

Thickening 100 At an opening: insulation becomes concrete Joint 20 An element end: set back, with a sealant groove Outer corner 270 The outer leaf and the insulation carry on Tongue 50 A T: a tongue into the through wall's groove Chamfer 15 Any edge: a chamfer, cut away Concrete Insulation Cut away Made by the detail In plan · exterior on the left · the edge at the top
Five edge details on a sandwich wall. Each is one named section, drawn across the wall's layers and swept along an edge. The names are examples: your organisation names its own.

A precast element is a wall

Stomra has no separate precast wall system and no precast mode. A precast wall element is a wall drawn with the Wall tool, with the layers its type gives it: a sandwich wall has an outer leaf, insulation and an inner leaf; a solid wall has one layer. One wall is one factory element. A long run is divided into elements with Split, which leaves a joint between them.

Three things turn such a wall into an element a factory can make:

Edge details

A named section swept along an edge: the ends, the top, the bottom, and the sides, head and sill of each opening.

Cast-in items

Lifting anchors, sleeves, fixing plates, sandwich ties and conduit, placed in the wall and moving with it.

Reinforcement

Mesh in each concrete layer, bars along edges and round openings, and the bars each cast-in product asks for.

Everything else stays as it is: openings, wall outlines, Split, bar sets, History and versions. Each element becomes a piece with its own shop drawing, as described in Shop drawings.

Edge details

An edge detail is a type in the project's catalogue. It is a small 2D section drawn across the wall at an edge, measured from the wall's exterior face and in from the edge. The section is made of regions, and each region does one of two things:

The detail is swept along the whole edge, or along part of it. An opening's four details meet at its corners, and at the wall's corners the ends run full height while the top and bottom stop between them, so every corner is filled once. On a wall under a roof, a top detail follows each layer's own top as built, flat or sloped.

Because a detail is a type, changing it changes every wall that uses it. Quantities, weights, drawings and 3D all follow the new shape of the layers.

Edge details work on any layered wall, not only on concrete. A facade panel run on 25 mm below a timber wall's foot is a region past the bottom edge in the panel's layer.

Situations: the same detail for the same place

A precast project stays consistent when every edge of the same kind gets the same detail. Stomra reads each edge's situation from what it meets:

SituationWhere
JointAn end that meets another precast element in line
Outer corner, inner cornerAn end that meets another element at a corner
TAn end that meets another element whose line goes on
Free endAn end that meets nothing
Opening side, head, sillThe edges of a door or window
Top, bottomThe top at a floor and the bottom on the foundation
LiftA stretch of the top under each lifting anchor

An edge detail type can say which situation it is for. The plan then puts it on every edge of that situation, and the check names any edge detailed differently from the project's other edges of the same situation.

Sandwich corners

At a corner of two sandwich elements, the insulation should go round the corner unbroken. The usual way is that one element runs through and carries the insulation round on its end, while the other ends a joint short of its face. Where the supplier instead laps the outer leaves, the project's corner rule is set to lapped and the plan proposes that corner instead. The check reads every end of a sandwich element from its actual shape and names insulation that shows, insulation that ends against the other element's leaf, and leaves that meet across the joint, which would be a cold bridge.

Cast-in items

A cast-in item is a component that sits in its wall. Its type says what it is and what shape it has:

The type can also hold the product (supplier and article), the layer the item must sit in (a lifting anchor in the bearing leaf, never in the insulation), its stated load, a recess former that cuts the wall round it, and an edge detail or a bar it brings with it.

Each item is placed in the wall's own frame: the face it looks out of (exterior, interior, top, bottom or an end), how far along the wall, how far up, and how far in from the exterior face. It can be turned, leaned at an angle, and repeated as a row with a count and a spacing. The Inspector shows these as the item's Cast-in item section, where you move, turn or lean it by hand.

Items move with their wall. Split hands each one to the element it stands in, flipping the wall keeps each in its layer, and deleting the wall deletes them. Loose parts that travel with an element but are not cast in (a threaded rod, a washer) can be added to its piece; the drawing lists them apart and leaves them out of the element's weight.

Weight, centre of gravity and lifting

Stomra weighs each element body by body, by its material: concrete at 2 400 kg/m³, stone wool at 100, EPS at 20, and so on. Edge details and openings change the bodies, so the weight, the concrete volume and the centre of gravity follow them.

Lifting anchor Lifting anchor lift detail Centre of gravity 6 000 · sandwich 150 / 200 / 70 2 800 The lifting check Weight8 360 kg as a load82 kN × lifting factor1.3 Needed107 kN 2 anchors2 × 60 kN Stated120 kN Enough: no flag Centre of gravity between the anchors
A worked example. The anchors' stated loads, added up, are compared with the element's weight times the lifting factor. Stomra flags a shortfall, and a centre of gravity outside the anchors, where the element would tip. It does not design the lifting.

Give the lifting anchors their stated load, as the supplier states it, and the check does two things: it compares the sum of the anchors' loads with the element's weight times the lifting factor (1.3 unless the project sets another), and it flags a centre of gravity that falls outside the anchors along the element. Both are flags for the engineer and the supplier to look at, never a design.

The project's rules

Each project keeps a few precast rules. They are starting values the organisation can change, never regulation:

RuleStarting valueUsed for
Joint16 mmThe gap Split leaves between elements
Lifting factor1.3The lifting check
Smallest pier250 mmThe check of piers beside openings, and how far the plan keeps joints from them
Smallest lintel300 mmThe check of lintels over openings
CornerWrappedHow sandwich corners are proposed: wrapped or lapped
Longest, highest, heaviest elementNone until setThe supplier's and the crane's limits; checked once given
ReinforcementNone until setMesh, bar size, grade, cover and anchorage for the plan's reinforcement

Laying elements out with your assistant

Precast layout is done by your own assistant, Claude or ChatGPT, through the Stomra connector. Stomra hosts no AI of its own; see Modelling with AI for how the connector works. The precast work uses two tools, stomra_precast to read and stomra_precast_edit to write, followed by the shop drawing tools.

  1. Read. The assistant reads the elements, the catalogue of details, products and rules, each edge's situation, and the organisation's own examples in the Handbook.
  2. Plan, as a dry run. Stomra works out what it would do and writes nothing: splits for walls longer than the longest element, with joints kept clear of openings and of rows of cast-in items; a detail for every edge that has none, by situation; corners for sandwich walls; two lifting anchors for an element that has none; and the reinforcement, when the project has rules for it.
  3. You decide. What the plan cannot settle comes back as a list of questions, for example a corner where both elements run through, or a situation with two details to choose from. The assistant puts them to you instead of guessing.
  4. Apply. On your word the plan is written as one change: one Undo, one entry in History.
  5. Drawings. Each element becomes a piece with its mark and shop drawing.
  6. Check. Both tools check the result. The assistant fixes what they name, looks at the elements' drawings, and checks again.

Each proposal says why it stands where it does, such as the project's detail for a free end, or the Handbook example it came from. When an element has turned out well, the assistant can save it to the organisation's Handbook, with its details and products, so the next project starts from it.

The plan's lifting anchors are a starting layout: two in the top, either side of the centre of gravity, of the smallest product in the catalogue whose stated load is enough, clear of openings with a short lintel. The person and the supplier check them.

Reviewing an element

Nobody has to draw an element by hand, but a person opens it and reviews it. Select the wall and the Inspector shows:

The Inspector also marks an item that does not sit in the layer its product asks for.

Reinforcement

When the project has reinforcement rules, the plan reinforces each element:

Bars you place yourself are ordinary bar sets in the wall and stay when the plan lays its own again. The element's shop drawing then carries a view of each concrete layer's reinforcement and the bar list. The amounts are the engineer's to decide; the rules are a habit to start from.

Hollow core and plattbärlag floors

Precast floors follow the same idea: the floor stays a floor, and its type's structural layer is the precast product.

Hollow core elements side by side, each 1 200 wide HD101 HD101 HD102 joints between Plattbärlag plates 2 400 wide, a topping cast over them seam in the plate only, mesh over it lattice girders topping plate
Sections across the span. Hollow core elements are laid side by side and marked; a plattbärlag floor's seams go through the plates only, so the topping runs on.

Hollow core

Plattbärlag

What Stomra does not do