Phases: the building over time

Existing, demolition and new work in one model: draw any view at a phase, and play the work forward and back.

Week 14 · Frame · Level 2 Being built Being removed For a time Built Demolition Site Foundations Frame Roof Windows, doors Interior
The player under a 3D view. The phases are named stops along its line; what is being built is green, what is being removed red, what stands only for a time yellow.

The idea: one order of work in the model

A renovation or a new build happens in an order: what stands before the work, what is taken down, the site, the foundations, the frame level by level, the roof, and so on. In Stomra that order is part of the model. It is a list of phases, each with steps under it, and each step either builds or removes elements.

A step says which elements it reaches by a rule (levels, kinds of element, types), so a wall you draw tomorrow on level 2 is in the step that builds level 2 by itself. Where a rule does not reach, you place single elements by hand. Nothing is stamped on the elements themselves: every view, drawing and player reads the phases, so reordering a phase or changing a rule updates them all at once.

Phase

A stage of the work, such as Demolition, Foundations or Roof. Phases have an order you can change.

Step

A part of a phase that builds or removes, for example the new walls of level 2.

Rule

What a step reaches: levels, kinds of element and types. Read live, so it follows the model.

Pick

An element placed in a phase by hand. A pick wins over the rules.

An element's status (existing, new or demolished) stays what it is: the element's nature. Everything else, such as "temporary" or what stands at a given phase, is worked out from the phases.

The Phases panel

Open the Phases tab, after Costs, and choose Phases. A panel beside the model lists the order the work goes in: each phase with its steps, what each step builds or removes in a few words ("Walls", "Columns", a level), how many elements it reaches, and its weeks. Click a row to select its elements in the model.

The same tab also sets the phase the open view shows and how it is drawn, and starts Play the work.

Every model plays without setup

Until you keep phases of your own, the panel shows starter phases read from the model by rule: existing, demolition, site, foundations, the frame level by level, the roof, windows and doors, interior, installations and landscaping. They follow the model as it changes. Keep these phases makes them the project's own; your first change in the panel does the same. Back to the starter phases, at the foot of the panel, gives your own phases up again after asking.

Change the phases

  1. Open a row's menu (the three dots, or a right click): Edit, Add a step, Add a phase after it, Move up, Move down, Delete. Add phase at the foot adds one last.
  2. Edit (or a double click, or F2) opens the phase or step in place: its name, its working days, whether it builds or removes, and the levels, kinds of element and types it reaches. The count on the row follows as you choose.
  3. A removing step takes what is to be demolished, what the work built itself (temporary things), or both.
  4. Drag a row to its place, or move it with Alt and the arrow keys. A step moves among the steps of its phase.

Each change is made at once and is one step to undo; there is nothing to save. Deleting a phase or step that has elements asks first; the elements stay in the model.

Not placed in time, at the foot of the panel, counts the new elements no step builds and the demolished elements no step removes. Click it to select them and place them.

When an element is built and removed

Select one element or five hundred, of any kind. The Inspector's Phasing section shows Status, Built in and Removed in, and lets you change them for everything selected.

Wall · level 2PHASING StatusNew Built inFrame · Level 2 by the rules Removed inNot removed Sheet piles · 14 selectedPHASING Built inSite picked Removed inFoundations picked Temporary: Site to Foundations
A sketch of what the Phasing section says. A wall placed by the rules, and temporary works placed by hand.

A view at a phase

Any view can show a phase. Choose it under Phase on the Inspector's View tab, or on the view bar once the project keeps its phases. The view then shows the building as it stands when that phase is done: what is built by then and still there. What is not built yet, and what has been removed, is left out. All phases is the whole model.

This holds for plans, sections, elevations and 3D views, for the view on a sheet, its PDF and what you publish, and for the symbols a view draws.

Rooms, tags and dimensions follow the phase

What you draw takes the view's phase

What you draw in a view set to a phase is built in that phase. Where the rules already build it there, nothing changes; where they would not, it is placed in the phase for you, and the status line says so, for example "Built in Roof, this view's phase." One undo takes the element and its place back together. In a view of the building before the work, what you draw is existing.

The looks of a phase

A view at a phase also has a look. Choose it under Phase look, beside Phase. One model gives the existing plan, the demolition plan and the new plan by switching the look.

New bold,removed dashed The renovation drawing. New red,removed yellow As on German, Austrian and Swiss permit drawings. This phase in colour Built green, removed red, temporary yellow, what was there grey. Demolition plan What was there and what the phase removes; nothing it builds.
One room in four looks: a partition is taken down and a new wall with a door is built.
LookWhat it shows
Built so farThe building as it stands when the phase is done. The default.
This phase in colourWhat the phase builds in green, what it removes in red, what it builds and takes down again in yellow, what was there before in grey.
New bold, removed dashedThe renovation drawing: new work full, existing light, removed dashed.
New red, removed yellowThe same, in the colours of a German, Austrian or Swiss permit drawing.
Demolition planWhat was there and what the phase removes. Nothing the phase builds.
New work planWhat was there and what the phase builds.

The looks hold in plans, sections, elevations and 3D, on a sheet and in its PDF. An element no step places is drawn by its own status.

Doors, windows and the walls they sit in

A view at a phase draws each wall with the holes it has at that phase.

Fill a removed door's hole with a wall

Select one or more removed doors or windows and choose Fill with a wall in the Inspector under Phasing (the row Hole). Stomra draws a wall in each hole, of the host wall's type, as wide and high as the door, named Infill. It is an element like any other: it is drawn as new work in its phase, quantities count it, and you can change its type or phase. It is built in the phase the rules build such a wall in, or in the phase that removes the door where that is later. One undo takes it back.

A new door where a removed one was

You can draw a new door or window over one whose status is demolished, wholly or in part. A view at a phase shows them in turn: the old one in its hole until it is removed, the hole as the old one left it until the new one is built, then the new one in its own hole, with wall where only the old one was. In the model as a whole the hole is the new one's: the wall's body, its frame, its net area and the rooms' wall areas count one hole. The phase checks tell you if the new one is built before the old one is gone. Two doors or windows that both stand still may not overlap.

Where their shapes do not share a part of the wall, for example in the corner beside a removed arched or gable window, the new one is refused with a message that says so.

The wall cut out for a new door

In the Demolition plan look, where the phase builds a door or window into a wall that was there before the work, the piece of wall taken out for it is drawn dashed in the opening, as removed. It shows in plans, sections and elevations, and in the removed tone in 3D views, on sheets and in issued drawings. A click on the piece selects its wall. Nothing is added to the model.

Play the work

A 3D view has the button Play, beside Walk. It opens a player at the foot of the view that shows the building through the work, from before the first phase to the work done.

  1. Open a 3D view and press Play. The player opens standing still at the end of the view's phase.
  2. Click or drag along the line, or step to the stop before or after (the start of a phase or a step) with the arrows beside Play.
  3. Press Play to run it like a film, at half, normal, double or four times the pace, and over again if you choose.
  4. To keep a moment, choose Save as view: the phase you stand in becomes a view of its own, from where you look, named after the view and the phase.

The bar says the phase, the steps under way and the week; with phases of your own, the date too. The legend is always in the bar. Each wall stands with the holes it has on the day shown, and a section box cuts the walls as they stand.

Playing changes nothing in the model. You can orbit, select and use the section box while it plays, and closing the player gives the view back as it was.

KeyIn a 3D viewIn walk mode
Open or close the playerPlay on the view barB, or Play the work in the walk's menu
Play and pauseSpaceN
Stop before / after← →, .
Start / endHome Endthe bar, with the menu open

Walk the work

In walk mode the player stands at the foot of the walk, with the same bar. You stand in the building as it is on the day played: what is not built yet is not there and what has been removed is gone, so you walk where a wall will stand, and a wall whose door is not built yet cannot be walked through. Closing the player gives the walk back as it was. The player plays the model as it is now, not a version you have stepped to in History.

Show it to your client

Where a model keeps its phases, the model's large view in the client portal has Play the work among its tools: the same bar and colours as in the app, with the same keys. The portal's walk plays too.

  1. In the Phases panel, choose Keep these phases (a model with only the starter phases is not played to clients).
  2. Publish an issue with the 3D for the client portal.
  3. Under Clients, open a client's menu and choose Copy link to the work played. The link opens the model playing; it is the client's own link with #/play at its end.

On a phone the view's tools take two rows and the bar shows the phase over its week.

Phases with your assistant

An assistant connected to Stomra reads and changes the phases as you do. Ask it where an element is built and removed, what stands at a phase or on a day, and what the phases leave unplaced. It can keep the starter phases, rename and reorder them, give them days, add steps with rules (for example "the new walls of level 2"), place single elements by hand, such as formwork or a site hut, and fill a removed door's hole with a wall.

Good to know