The site: place, ground and grading
Where the project stands, the ground as it is, the ground you make of it and what is dug: one live model, drawn in every view.
Four words
The ribbon's Site tab works with four things. Each is stored once in the model; contours, sections, 3D, quantities and the IFC export follow from them.
Place
Where on earth the project stands, and which way north is.
Ground
The site as it is (befintlig mark): measured points and the surface through them.
Grading
What you make of it (ny mark): pads, batters and the fall away from the house.
Excavation
What is dug (schakt): worked out from the foundations, by a few rules.
The same conventions hold everywhere: existing ground is dashed, new ground is solid, cut is red, fill is blue, and every height is written in the project's height system with its sign, such as +7,80.
Place the project on the map
- Choose Site ▸ Find on map. A street map opens.
- Search for an address. The project's outline is drawn over the map at true scale.
- Move the map until the lot lies under the house. The cross is the project's origin.
- Under North, turn the house so that the map's north is true north.
- Use the place. Its coordinates are shown in WGS 84 and in SWEREF 99 TM.
The place is read by the sun in 3D views and in walk mode, by a 3D view's shadow study and sun path, and by the IFC export, which writes the model georeferenced. Until a project has a place, the sun is Stockholm's. You can also type the latitude, longitude and true north under Project ▸ Settings ▸ Site and sun.
Bring in the ground
Site ▸ Ground asks where the ground comes from.
| Source | How | Accuracy |
|---|---|---|
| The map | In Find on map, Get the ground here takes the map's heights for about 120 × 120 m around the house. Set ±0 to the ground also puts the floor 0,30 m over the ground there. | About ±2 m |
| A survey | Points as x y z per line, in a CSV, TXT or XYZ file. | The survey's |
| The nybyggnadskarta | The municipality's map as DXF: its contours at their heights, spot heights and height blocks. It can bring the property lines too. | The map's |
| A LandXML surface | A surface from a surveying or civil program. | The file's |
| A height grid | A GeoTIFF or an ESRI ASCII grid (.asc), such as Lantmäteriet's 1 m elevation model. Only the part around the project is read. | About ±0,1 m for the 1 m model |
Coordinates can be metres or millimetres in the model's own system, or SWEREF 99 TM, in which case the project must be placed on the map first. Heights are in metres in the height system. The file is read in your browser and previewed, with its lowest and highest point, before you press Use … points as the ground.
The map's heights come from a coarse model in which trees and houses can lift the ground. Use them to place the house and start sketching, never for a building permit. The Inspector and the site report say that the ground is approximate.
Select the ground to see it in the Inspector: where it came from, how many points it has, its extent, its lowest and highest point. Contour interval sets how far apart its contours are (every fifth is heavier and labelled), and Ground shift raises or lowers every point, to fit a survey to the project's height.
Heights
Elements are held in millimetres above the project's ±0. Drawings, the Inspector and the site report write heights in metres in the height system, with the project's elevation offset added, for example +12,35. A pad's height is typed the same way.
Grade the ground
The finished ground is the existing ground with your grading laid over it. Grading is made of two tools.
Fall from house
- Select the house's floor, its outer walls or its foundations.
- Choose Site ▸ Fall from house.
The ground is laid 300 mm under the floor at the facade, falls at 1:20 over 3 m, then meets the existing ground with a 1:2 batter. The ring follows the outside of what you selected, inner corners included. Fall width and Fall ratio in the Inspector change it. Select the outer walls together with the floor, so the fall starts at the facade rather than at the floor's edge.
Pad
Site ▸ Pad sketches a pad, like a floor: a terrace, a yard, a drive or a parking area. In the Inspector:
| Field | What it does |
|---|---|
| Pad height | Its height in the height system. |
| Pad fall | A sloped pad: its fall in per mille; 0 for a level pad. Pad height at says whether the height is at the high point or at the outline's first point. |
| Pad edge | Batter runs down or up to the ground at Batter 1: n (1:2 unless set). Retaining wall holds the edge instead: the ground beyond stays and steps at the wall. Draw the wall itself with the Wall tool. |
| Pad order | Where pads overlap, a higher order lies on top. Pads of the same order lie as they were made, a later one on top. |
A pad's type sets its surface: grass, gravel or paving. Because later pads lie on top, a yard can cut into the fall from the house; the site report then names any facade where the ground now falls toward the house.
Do not lay a pad under the house to clear the ground out of a basement or a slab. What is built in the ground cuts it by itself; see The ground cut by what is built in it.
Excavation
Every foundation or slab that lies below the ground gets a pit by itself: its bottom out to a working space, then sides that slope up to the ground. Topsoil is stripped where the ground is dug or paved. The rules are the project's, in the Inspector when the ground is selected, under Excavation:
| Field | Default | What it is |
|---|---|---|
| Working space | 500 mm | Room to work beyond the lowest body (arbetsutrymme). |
| Pit slope | 1:1,5 | The pit's sides. 1:1,5 suits friction soil above the groundwater; a geotechnical report decides. |
| Topsoil depth | 250 mm | Topsoil (matjord) stripped where the ground is dug or paved. |
| Clearance | 0 | How far outside what is built the finished ground is cut away. See The ground cut by what is built in it. |
| Dig for foundations | On | Off: no pits, for a study or a site without its own foundations. |
A site layer of the Soil kind is the ground itself, and is not dug.
Earthworks and warnings
With the ground selected, the Inspector's Earthworks section counts the whole site, live:
- Cut: where the new ground lies under the existing ground.
- Fill: where it lies over it.
- What roads and parking move, as a part of cut and fill.
- Excavation: dug for the foundations, down to the pits' bottoms and sides.
- Topsoil stripped, and the backfill that goes back round the foundations (approximate).
The site report adds the ground at each corner of the house, the fall at each facade, and warnings: ground that falls toward the house at a facade, a building outside the lot or nearer the boundary than the setback, a shed or slab that sits above or below the finished ground. Every site object says what it is in one line, for example "Level at −0,30, with a 1:2 batter to the ground".
Drawings and 3D
Drawings follow the ground as soon as it changes.
- Plans on the ground's storey draw the existing contours thin and dashed, the new contours solid where the ground changes, every fifth labelled and reading uphill, spot heights at pads, 1:20 arrows on each fall and the crest of each pit.
- Site ▸ Site plan makes a Situationsplan at 1:400 over the ground, with contours, spot heights, falls and the buildings.
- Sections cut the ground as they cut the house: the existing ground dashed, the finished ground solid with its band of earth, the pit dash-dot.
- 3D stands the building on the finished ground, and so do sheets, their PDFs, walk mode and the client portal. A 3D view's section box cuts the ground too.
- A view that hides the grading shows the ground as it is; a view that hides both terrain and grading shows no ground.
In an IFC export the finished ground is a terrain (IfcGeographicElement), and a project with a place is georeferenced in SWEREF 99 TM with RH2000 heights.
Site stages
A view shows the site at one stage. Choose it under Site stage in the Inspector, or on the view bar:
| Stage | What the view shows |
|---|---|
| Existing ground | The ground as surveyed, before the work. New buildings are left out; existing ones and those to be demolished stand. |
| Excavation | The topsoil stripped under the pits and hard surfaces, the pits open and the grading's cuts dug. No fill yet. |
| Finished ground | The ground graded and backfilled, its surfaces laid. A view without a stage shows this one. |
A stage is a setting of the view, never a copy of the ground: for the untouched lot, the open pits and the finished yard, make three views of one model. The client portal chooses the same way what its 3D shows of the site (Site in 3D). For the building's own order of work, see Phases: the building over time.
More on the Site tab
| Tool | What it makes |
|---|---|
| Property line | The lot's boundary (fastighetsgräns), drawn dash-dot with each side's length, and the setback buildings keep inside it, 4,5 m unless set (0 for none). The report names what stands outside the lot or too near it. |
| Water | A pool, a pond or a creek, sketched by the top of its banks: dug to its bottom, filled to its surface, blue in plans, a mirror in 3D and walk mode, with its area and volume. |
| Planting | Trees, shrubs and hedges, standing on the finished ground: in 3D, plans, elevations, walk mode and the client portal. |
| Road, Parking | Roads, driveways and paths along a centreline, and rows of parking spaces. They grade the ground as a pad does, and their cut and fill are counted. |
| Site layers | Layers such as crushed stone or soil, sketched by their boundary, with a top elevation and thickness. |
With your assistant
An assistant connected to Stomra uses the same four words and checks its work with numbers. stomra_site gives the site report (corners, the fall at each facade, cut, fill, excavation, topsoil, backfill and warnings) and samples the existing ground, the finished ground and the pits' bottoms at any points. stomra_site_edit brings the ground from the map, lays the fall from the house, plants and makes the Situationsplan. The ground and pads are ordinary elements, so an assistant can also write them directly, as one step to undo, and look at the Situationsplan to check. Ask, for example, "lay the fall around the house and tell me if the ground falls toward it anywhere". See Modelling with your AI assistant.
Good to know
- Only points and outlines are stored. The surface, contours, pits and quantities are worked out from them, and again whenever the ground, a pad, a foundation or a level changes.
- A ground can hold up to 50 000 points; thin a dense grid first.
- A sloped body cuts the ground level, at its lowest point.
- Nothing follows the ground by itself: when the ground moves, a shed's slab stays where it is, and the report says if it is now above or below the ground.